fbpx

Local Roadworks Starting This Week!

Local Roadworks This Week!

Don’t let roadworks hold you up!

Details of all roadworks happening in the next 7 days likely to cause delays locally impacting:

Hersham, Walton on Thames, Weybridge, Molesey, Esher, Cobham, Claygate, Surbiton, Chertsey, West Byfleet, Kingston, Thames Ditton, Leatherhead, Egham and others!

________________________________________

For flexible car repairs, car servicing and MOTs 

https://www.hershamservicestation.co.uk/

01932 229 022 | 01932 222 855 | service@hershamss.co.uk

Open: Mon to Thu 8 am – 6pm | Fri 8 am – 5.30 pm

________________________________________

A307 Portsmouth Road, Esher, Surrey

03 November — 03 November
Delays likely – Lane closure
Works location: From Scilly Iles Roundabout – 150m South on Portsmouth Road…
Works description: Carriage Way Cleaning…
Responsibility for works: Surrey
Current status: Advanced planning
Works reference: MA400CYELMBRIDGE04-A-P2
________________________________________

A309 Kingston Bypass, Esher, Surrey

03 November — 03 November
Delays likely – Lane closure
Works location: From Scilly Iles Roundabout – Manor Road…
Works description: Carriage Way Cleaning…
Responsibility for works: Surrey
Current status: Advanced planning
Works reference: MA400CYELMBRIDGE04-C-P2
________________________________________

A309 Scilly Isles Roundabout, Esher, Surrey

03 November — 03 November
Delays likely – Lane closure
Works location: Scilly Iles Roundabout…
Works description: Carriage Way Cleaning…
Responsibility for works: Surrey
Current status: Advanced planning
Works reference: MA400CYELMBRIDGE04-B-P2
________________________________________

Alexandra Road, Thames Ditton, Surrey

02 November — 03 November
Delays likely – Road closure
Works location: Summer Rd – River Bank…
Works description: Resurfacing
Responsibility for works: Surrey
Current status: Advanced planning
Works reference: MA400CP20-593783-RES
________________________________________

Between Streets, Cobham, Surrey

01 November — 01 November
Delays likely – Traffic control (multi-way signals)
Works location: o/s 15
Works description: Connections Projects: Installation of a new electricity supply for a customer: From the customer’s…
Responsibility for works: UK POWER NETWORKS SOUTH EASTERN
Current status: Advanced planning
Works reference: KZ50094209994
________________________________________

Copsem Lane, Esher, Surrey

28 October — 30 October
Delays likely – Traffic control (multi-way signals)
Works location: 43 CLAREMONT LANE (J/O) MIlLBOURNE LANE…
Works description: Valve Repack 0 to 6″ Carriageway in Carriageway. Our intention is tocomplete the Permanent Reinstate…
Responsibility for works: Thames Water
Current status: Advanced planning
Works reference: MU302000031465669-001
________________________________________

Esher Road, East Molesey, Surrey

02 November — 06 November
Delays likely – Traffic control (two-way signals)
Works location: Junction with Riverside Avenue…
Works description: Network Operations Maintenance: Essential and immediate replacement or repair of multi-way link box…
Responsibility for works: UK POWER NETWORKS SOUTH EASTERN
Current status: Advanced planning
Works reference: KZ50064993110
________________________________________

Hampton Court Way, East Molesey, Surrey

28 October — 29 October
Delays likely – Traffic control (two-way signals)
Works location: Hampton Court Way, approx 70m from BP petrol Station on opposie side of the road,…
Works description: 2 Way lights required on Hampton Court Way to provide set up area for MEWP required to carry out ess…
Responsibility for works: O2 (UK) Limited
Current status: Advanced planning
Works reference: MG080GBC-5218-3
________________________________________

Hersham Road, Hersham, Walton-on-thames, Surrey

30 October — 30 October
Delays likely – Traffic control (two-way signals)
Works location: Jct of Felcott Road
Works description: TM for works on Felcott Road…
Responsibility for works: Surrey
Current status: Advanced planning
Works reference: MA400CP20-829951-TS
________________________________________

Kingston Bypass, Esher, Surrey

29 October — 02 November
Delays likely – Lane closure
Works location: From Manor Road – Slip Road Kingston Bypass Joining A3…
Works description: Carriage Way Cleaning…
Responsibility for works: Surrey
Current status: Advanced planning
Works reference: MA400CYELMBRIDGE02-03-P2
________________________________________

Kingston Bypass, Esher, Surrey

02 November — 06 January
Delays likely – Lane closure
Works location: Roundabout joining the Jct with Claygate lane…
Works description: footway reconstruction & TM…
Responsibility for works: Surrey
Current status: Advanced planning
Works reference: MA400FR20-S4236-S58-C
________________________________________

Kingston Bypass, Esher, Surrey

02 November — 06 January
Delays likely – Lane closure
Works location: From Rise Hill Footpath up to the slip road…
Works description: Footway Reconstruction…
Responsibility for works: Surrey
Current status: Advanced planning
Works reference: MA400FR20-S4236-S58-A
________________________________________

Kingston Bypass, Long Ditton, Surbiton, Surrey

02 November — 06 January
Delays likely – Lane closure
Works location: From the start of the slip road up to county boarder…
Works description: Footway Reconstruction…
Responsibility for works: Surrey
Current status: Advanced planning
Works reference: MA400FR20-S4236-S58-B
________________________________________

Leatherhead Road, Oxshott, Leatherhead, Surrey

02 November — 06 November
Delays likely – Traffic control (two-way signals)
Works location: Outside Princess Cottages, Leatherhead road, Oxshott, KT22 0EX…
Works description: New connection to 180mm main…
Responsibility for works: SES WATER (Formerly SUTTON & EAST SURREY
Current status: Advanced planning
Works reference: DZ0012088535
________________________________________

Lynne Walk, Esher, Surrey

03 November — 03 November
Delays likely – Road closure
Works location: From Millbourne Lane to Turning Area ( Full Lentgh )…
Works description: Resurfacing
Responsibility for works: Surrey
Current status: Advanced planning
Works reference: MA400CP20-829951-A
________________________________________

Manor Road North, Hinchley Wood, Esher, Surrey

29 October — 29 October
Delays likely – Traffic control (multi-way signals)
Works location: Manor Road south jw Kingston By Pass J517…
Works description: Recut Loop SL23
Responsibility for works: Surrey
Current status: Advanced planning
Works reference: MA01836241305
________________________________________

Milbourne Lane, Esher, Surrey

03 November — 03 November
Delays likely – Traffic control (two-way signals)
Works location: Millbourne Lane Junction with Lynne Walk…
Works description: Resurfacing
Responsibility for works: Surrey
Current status: Advanced planning
Works reference: MA400CP20-829951-B
________________________________________

Portsmouth Road, Thames Ditton, Surrey

27 October — 29 October
Delays likely – Traffic control (two-way signals)
Works location: OUTSIDE 15A PORTSMOUTH ROAD…
Works description: Laying duct in the foot way….
Responsibility for works: Openreach
Current status: Advanced planning
Works reference: BC417SE0000000113049ONSA
________________________________________

Queens Road, Weybridge, Surrey

04 November — 04 November
Delays likely – Traffic control (two-way signals)
Works location: opp. 32 Queens Road, St George’s Hill, Hersham, Elmbridge, Surrey, South East, England, United Kingd…
Works description: M J Quinn to Right stand-off on existing BT cabinet with 1m duct into floor box. 3m duct in footway…
Responsibility for works: Openreach
Current status: Advanced planning
Works reference: BC118WEYBRIDGE11
________________________________________

Stoke Road, Cobham, Surrey

02 November — 04 December
Delays likely – Traffic control (multi-way signals)
Works location: FROM THE JUNCTION WITH PIPERS CLOSE TO THE JUNCTION WITH RAVENSWOOD CLOSE, CW / FW / VERGE…
Works description: GAS MAIN REPLACEMENT. TO RELAY 13 SERVICES, MAKE 3 CONNECTIONS AND ABANDON 511M OF EXISTING 3″CI / 4…
Responsibility for works: SGN
Current status: Advanced planning
Works reference: XW053W117410641-01359
________________________________________

Summer Road, Thames Ditton, Surrey

27 October — 27 October
Delays likely – Traffic control (two-way signals)
Works location: Side of 46 TO opposite 46…
Works description: interim to perm, cw 7m, fw 4m…
Responsibility for works: Openreach
Current status: Planned work about to start
Works reference: BC006KLONSASE00000086254
________________________________________

A30 Egham Hill, Egham, Surrey

28 October — 29 October
Delays likely – Lane closure
Works location: Egham Hill Roundabout…
Works description: Carriageway Cleaning
Responsibility for works: Surrey
Current status: Advanced planning
Works reference: MA400CYRUNNYMEDE01-B-P2
________________________________________

A320 Guildford Road, Chertsey, Surrey

30 October — 31 October
Delays likely – Lane closure
Works location: Guildford Road Rbt up to 50m past St Peters Hospital on Guildford Road Chertsey…
Works description: Carriageway Cleaning
Responsibility for works: Surrey
Current status: Advanced planning
Works reference: MA400CYRUNNYMEDE05-B-P2
________________________________________

A320 St Peters Way, Chertsey, Surrey

30 October — 31 October
Delays likely – Lane closure
Works location: from St Peters Way Chertsey rbt down to Guildford Road Rbt…
Works description: Carriageway Cleaning
Responsibility for works: Surrey
Current status: Advanced planning
Works reference: MA400CYRUNNYMEDE05-A-P2
________________________________________

Ashford Road, Laleham, Surrey

30 October — 30 October
Delays likely – Traffic control (multi-way signals)
Works location: OUTSIDE 245/247 Ashford Rd…
Works description: Replace decayed pole
Responsibility for works: Openreach
Current status: Advanced planning
Works reference: BC417SE00000088747ONSA-1
________________________________________

Byfleet Road, New Haw, Surrey

02 November — 06 November
Delays likely – Traffic control (two-way signals)
Works location: The main is located in the farside carriageway opposite 29 Byfleet Road 7.1m across….
Works description: New gas service to 5 Wey Manor Flats, 29 Byfleet Road…
Responsibility for works: Cadent
Current status: Advanced planning
Works reference: AZ7031000979818
________________________________________

Chertsey Road, Ashford, Surrey

29 October — 29 October
Delays likely – Traffic control (Stop/Go boards)
Works location: Chertsey road by Staines road west J243…
Works description: Recut N12431E1
Responsibility for works: Surrey
Current status: Advanced planning
Works reference: MA01815885005
________________________________________

Green Lane, Shepperton, Surrey

29 October — 29 October
Delays likely – Traffic control (priority working)
Works location: WORKING FROM M/H COVER LOCATED IN HIGHWAY…
Works description: JET CLEANING AND CCTV SURVEY OF SEWERS…
Responsibility for works: Thames Water
Current status: Advanced planning
Works reference: MU03700002175
________________________________________

Green Lane, Shepperton, Surrey

30 October — 30 October
Delays likely – Traffic control (two-way signals)
Works location: 24 Green Lane
Works description: Tree works
Responsibility for works: Surrey
Current status: Advanced planning
Works reference: MA01504250-SPEL-GL-1
________________________________________

Green Street, Sunbury On Thames, Surrey

30 October — 30 October
Delays likely – Traffic control (two-way signals)
Works location: At Jct with Homewaters…
Works description: Tm for works on Homewaters…
Responsibility for works: Surrey
Current status: Advanced planning
Works reference: MA400CP20-828276
________________________________________

High Street, Addlestone, Surrey

03 November — 10 November
Delays likely – Traffic control (multi-way signals)
Works location: Outside 23
Works description: Network Operations Maintenance: Essential and immediate replacement or repair of multi-way link box…
Responsibility for works: UK POWER NETWORKS SOUTH EASTERN
Current status: Advanced planning
Works reference: KZ50082775736
________________________________________

Homewaters Avenue, Sunbury On Thames, Surrey

30 October — 30 October
Delays likely – Road closure
Works location: 10m from the jct with Green Street…
Works description: 10m from the jct with Green Street…
Responsibility for works: Surrey
Current status: Advanced planning
Works reference: MA400CP-828276-A
________________________________________

Lyne Crossing Road, Lyne, Surrey

03 November — 05 November
Delays likely – Traffic control (two-way signals)
Works location: LYNE HILL LODGE BARN, LYNE CROSSING ROAD, LYNE, CHERTSEY, SURREY…
Works description: 1 x 32mm mdpe, with 15mm meter, on to a 4″CI main. (C/W 1M, VERGE 6M)…
Responsibility for works: Affinity Water
Current status: Advanced planning
Works reference: MX054289813300
________________________________________

Maxwell Road, Ashford, Surrey

02 November — 03 November
Delays likely – Road closure
Works location: From Cecil Road to Staines Road West service road…
Works description: CW resurfacing
Responsibility for works: Surrey
Current status: Advanced planning
Works reference: MA400CP20-828250
________________________________________

North Street, Egham, Surrey

04 November — 06 November
Delays likely – Road closure
Works location: 45B, NORTH STREET, EGHAM, SURREY…
Works description: COMMUNICATION PIPE – INSTALL ; 25 MDPE; 3″ CI; 1 OF 1…
Responsibility for works: Affinity Water
Current status: Advanced planning
Works reference: MX054289232200
________________________________________

Parvis Road, West Byfleet, Surrey

28 October — 01 November
Delays likely – Traffic control (two-way signals)
Works location: LEFT SIDE OF NORTH C2 BUILDING…
Works description: DS0023193 – MAINS INSTALLATION TO NEW DEVELOPMENT ON BEHALF OF AFFINITY WATER – STANDARD SLG – TRAFF…
Responsibility for works: Affinity Water
Current status: Advanced planning
Works reference: MX043215ND1164
________________________________________

Prune Hill, Englefield Green, Surrey

30 October — 02 November
Delays likely – Road closure
Works location: Rusham Level Crossing…
Works description: Cable duct installation…
Responsibility for works: Network Rail
Current status: Advanced planning
Works reference: KL142RDG1-21-61-301020
________________________________________

Russell Road, Shepperton, Surrey

03 November — 05 November
Delays likely – Traffic control (multi-way signals)
Works location: Greenoak Homes_Crown Place, Russel Road, Shepperton, Surrey, TW17 9HQ…
Works description: 1 x 63mm mdpe (6 port manifold) with 15mm meters, on to a 3″CI main and 1 x disconnection…
Responsibility for works: Affinity Water
Current status: Advanced planning
Works reference: MX0542863350
________________________________________

Station Road, Egham, Surrey

01 November — 01 November
Delays likely – Traffic control (two-way signals)
Works location: Egham Level Crossing
Works description: Access and Egress of RRV…
Responsibility for works: Network Rail
Current status: Advanced planning
Works reference: KL142RDG1-21-07-011120

________________________________________

Stonehill Road, Ottershaw, Surrey

02 November — 23 November
Delays likely – Road closure
Works location: Section 50 works (Connect It Utility Services) o/s Garden Cottages & Little Orchards & Fairview Cott…
Works description: Section 50 works (Connect It Utility Services) New Water Mains…
Responsibility for works: Surrey
Current status: Advanced planning
Works reference: MA050S50-1519RUN
________________________________________

Stroude Road, Egham, Surrey

28 October — 29 October
Delays likely – Traffic control (multi-way signals)
Works location: Junction with Manorcrofts…
Works description: Remedial works following defect inspection – to rectify remedial works in carriageway…
Responsibility for works: Cadent
Current status: Planned work about to start
Works reference: AZ0071000948943
________________________________________

Vicarage Road, Sunbury On Thames, Surrey

29 October — 29 October
Delays likely – Traffic control (two-way signals)
Works location: St Saviours Church
Works description: Sewer cover replacement in carriageway…
Responsibility for works: Thames Water
Current status: Advanced planning
Works reference: MU026002141NMTD–001001
________________________________________

Woburn Hill, Addlestone, Surrey

27 October — 29 October
Delays likely – Traffic control (two-way signals)
Works location: OUTSIDE FIVE GABLES
Works description: REPLACE POLE
Responsibility for works: Openreach
Current status: Advanced planning
Works reference: BC417SE0000000082890ONSA

________________________________________

Get your business in front of your ideal clients and customers.

Find out how here

https://elmbridge.life/work-with-elmbridge-life/

________________________________________

Anyards Road, Cobham, Surrey

01 November — 01 November
Delays possible – Traffic control (multi-way signals)
Works location: at the junction with Between Streets…
Works description: Connections Projects: Traffic lights in secondary street for information only. Traffic lights for as…
Responsibility for works: UK POWER NETWORKS SOUTH EASTERN
Current status: Advanced planning
Works reference: KZ50044036466
________________________________________

Dorly Close, Shepperton, Surrey

30 October — 01 November
Delays possible – Traffic control (multi-way signals)
Works location: WHOLE STREET FROM J/O GASTON BRIDGE ROAD…
Works description: Remedial works following defect inspection – to rectify remedial works in carriageway…
Responsibility for works: Cadent
Current status: Planned work about to start
Works reference: AZ0071000890173
________________________________________

Row Town, Addlestone, Surrey

27 October — 29 October
Delays possible – Traffic control (two-way signals)
Works location: OUTSIDE 36
Works description: REPLACE DECAYED POLE IN VERGE…
Responsibility for works: Openreach
Current status: Advanced planning
Works reference: BC417SE0000000082901ONSA
________________________________________

Simplemarsh Road, Addlestone, Surrey

03 November — 10 November
Delays possible – Traffic control (multi-way signals)
Works location: Junction with High Street…
Works description: Network Operations Maintenance: Essential and immediate replacement or repair of multi-way link box…
Responsibility for works: UK POWER NETWORKS SOUTH EASTERN
Current status: Advanced planning
Works reference: KZ50008773311
________________________________________

South Avenue, Egham, Surrey

31 October — 01 November
Delays possible – Traffic control (multi-way signals)
Works location: Jnc Oak Avenue in the F/W…
Works description: Remedial works following defect inspection – to rectify remedial works in carriageway…
Responsibility for works: Cadent
Current status: Planned work about to start
Works reference: AZ0071000815087

________________________________________

 

Back to the Elmbridge Life Homepage

Have you joined the Elmbridge Life group on Facebook?

www.facebook.com/groups/elmbridgelife/

________________________________________

Recent Posts:

Run a local business? Let us help spread the word!

Coronavirus Confirmed In Surrey

 

________________________________________

Leave a Reply

Your email address will not be published. Required fields are marked *